Why Good Fabrication Drawings Are So Important?

Fabrication drawings are often overlooked, but they may be one of the most important steps in complex construction. The drawing may have detailed how elements are built, put together and installed. A good fabrication will provide the on-site contractor the exact measurements and number of elements wanted to complete the project. If the fabrication is inaccurate, it is causes delays and damage on-site.

Types of fabrication drawings

When working with steel structures, especially, you may expect to receive three types of fabrication drawings. Each one plays an important part in the construction process and a single project this is complex would require all three drawings. Be aware that even these refer to the type of drawings and not the quantity. Every type will require more than one drawing in a selection of views. The mark of a good fabrication drawing is the presence of simplest necessary information.

1. Single part drawing
2. Assembly drawing.
3. General arrangement drawing

What happens whilst the fabrication drawing is incorrect?

If incorrect or unfinished fabrication drawings are sent to the on-site construction team, things can go terribly incorrect. Below are the most common scenarios.

1. The steel structure is assembled incorrectly
If the drawings are obscure or left as much as interpretation, the on-site manager could assemble the structure badly. The structure will not uphold the identical safety specifications and could take more effort and fabric to disassemble. This is one of the worst troubles and it costs the most to fix.

2. Construction starts without the fabrication drawings

Fabrication drawings go through a series of strict quality assurance (QA) tests. This opens the process up to delays. If rushed, the on-site construction manager will be pressured into beginning construction. This means more delays and a waste of materials. It’s important to only start construction when you have the correct fabrication drawings.

3. Incorrect amount of materials


A sub-par fabrication drawing approach you might not order the materials you want. In the middle of construction, a hold up due to lack of materials can cripple your tight schedule.

4. Damaged to humans and property


If a steel structure is assembled incorrectly, it won’t have the supposed structural integrity. The structure may want to fail and damage other areas of the construction site– or worse, hurt a nearby worker.

The review process


Before a fabrication drawing is sent to the construction site, it goes through a strict review process. The people who complete the drawings pay incredible amounts of attention to detail. An on-site visit is often essential to gauge the overall scope of the project. The drawings are reviewed in-house via the supervising manager. Next, the proper drawings are sent to stakeholders or relevant parties who review them. Adjustments are then made and the drawings go through a final review before being sent to the development site.

If you think you need fabrication drawings and BIM Modelling in your construction project, then we can assist your project.